|
|
|
|
|
|
|
|
Transform
the site into a new built identity with higher performance and future aligned use.
|
Improve or Restore
existing identity.
|
Replace
a damaged or obsolete structure with a new version, often similar in purpose.
|
Assign a new Purpose
to an existing structure without full reconstruction.
|
|
|
Identity changes-Function, role, and performance shift.
|
Identity Preserved
Enhanced but not redefined.
|
Identity
may reset
but often retains original purpose or footprint logic.
|
Identity repurposed
new use layered onto old structure.
|
|
|
Significant reconstruction; selective demolition; new systems and configurations.
|
Limited structural change; typically avoids removing load supporting members.
|
Full structural replacement; may involve complete demolition and rebuilding.
|
Minimal structural change; retains most loadbearing elements.
|
Demolition Intelligence Role
|
High Selective demolition, sequencing, and structural reading integrated into transformation.
|
Low Demolition limited to finishes, systems, or non structural elements.
|
Moderate to High May require full demolition before rebuilding.
|
Moderate Selective Demolition to accommodate new use while preserving structure.
|
|
|
Safety, lifecycle, economic repositioning, performance upgrade, future use alignment.
|
Condition improvement, modernization code compliance, aesthetic refresh.
|
Structural failure, severe obsolescence, disaster recovery, cost benefit replacement.
|
Market shifts, cultural value, sustainability, preservation goals.
|
|
|
Broad-new configuration, systems, layout, and performance profile.
|
Narrow to moderate-system upgrades, finish improvements, targeted corrections.
|
Complete-new structure replaces old.
|
Moderate-new interior program, new systems, but structure retained.
|
|
|
Retained; transformation occurs on the existing site.
|
Retained; improvements occur within existing boundaries.
|
Often retained, but structure is replaced entirely.
|
Retained; structure reused with new purpose.
|
SID Sphere Classification
|
Transformation Work
-identity shift through reconstruction.
|
Modification Work
-improvement without identity change.
|
Replacement Work
- new structure built after removal.
|
Reassignment Work
- new purpose applied to existing structure.
|
|
|
Converting a failing mall into a mixed use district; replacing obsolete systems with new structural logic.
|
Updating interiors, replacing systems, improving finishes.
|
Unbuilding and rebuilding a structurally compromised school.
|
Turning a factory into loft housing or a church into a community center.
|
|
|